
Boulder Crash
作成者: armamac14
Description
A LSM launch coaster including a Tophat and Loop. Comes to a near stop after the loop and carried to the station by Drive Tires.
Blueprint Data
Running Cost: $1,698.74/day
Placement Cost: $27,564.59
作成者: armamac14
A LSM launch coaster including a Tophat and Loop. Comes to a near stop after the loop and carried to the station by Drive Tires.
Running Cost: $1,698.74/day
Placement Cost: $27,564.59