
Power Facility
作成者: TorturedChunk
Description
20 Generators, 8 Large Solar, 3 Mechanic Shops, 1 Large Staff Building. Connect to the outside distributors.
Blueprint Data
Placement Cost: $6,137.50
作成者: TorturedChunk
20 Generators, 8 Large Solar, 3 Mechanic Shops, 1 Large Staff Building. Connect to the outside distributors.
Placement Cost: $6,137.50